Follow Us: social media media social twiter social media QR Kod social media Language: Other Languages Text Size:
A+ A A-
Color: green red blue

HEADER JPNJ EN 180816

×

Warning

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.

Copy failed.



Maintainance of Forest Reserve Boundry Compartment

LogoPerhutanan

Attachment 1

JOHOR STATE FORESTRY DEPARTMENT
FOREST DEVELOPMENT PROJECT
TENDER

This offer is invited from contractors registered with and is still effective registration with Johor State Forestry Department, Ministry of Finance Malaysia (section code 222102) Sub Category: Area Cleaning, Bumiputera Company Registration Certificate by the Ministry of Finance, and Forest Development Certificate with Johor State Forestry Department to carry out Maintainance of Forest Reserve Boundry Compartment work at the following details:-

Tender No. Compt. & Forest Reserve Distance (KM) Site Visit
Date / Time Gathering Area
PPNJ. 21/2014 (IP)PP/8/ TENDER Part of Compartment 3,4,5 Dan 5F Panti 10 Kilometer

21 April 2014 (Monday)

10.00 am

Renjer Forest Office. Kota Tinggi.
Part of Compartment PA 36764,36762, 72214,72211, 72212 dan 46373 Seluyut 15 Kilometer
PPNJ. 22/2014 (IP)PP/9/ TENDER Part of Compartment 26,35,36,27 dan 28 Panti 19 Kilometer
PPNJ. 23/2014 (IP)PP/10/ TENDER Part of Compartment 110,111,128,126 dan 119 Lenggor 19 Kilometer

22 April 2014 (Tuesday)

10.00 am

Renjer Forest Office Lenggor, Jemaluang,Mersing

 

Quotation book can be bought during office hour at Payment Counter, Johor State Forestry Department after the site visit date with RM 50.00 payment for each form. The quotation book only will be sold to the contractor or his representative that attend the site visit to designated areas only. This payment shall be made in Money Order or Bank Draft under the name of ‘DIRECTOR OF JOHOR STATE FORESTRY’.

Contractor or his representative (having formal appointment letter) is required to bring along the original Certificate which is still valid during the site visit:

  1.     Ministry of Finance Malaysia Certificate (section code 222102),
  2.     Bumiputera Company Registration Certificate by the Ministry of Finance,
  3.     Contractor Registration Certificate with Johor State Forestry Department, and
  4.     Forest Development Certificate with Johor State Forestry Department

    (The certificate that are brought together should have shall have the certification by employer if the contractor does not have a Forest Development Certificate)

Completed quotation form should be placed in sealed envelope and write the offer number on the top left of the envelope and enter the bid form into the Quotation Box provided at the Johor State Forestry Department, 2nd Floor, Bangunan Dato’ Mohamad Ibrahim Munsyi, Kota Iskandar 79660 Nusajaya, Johor Darul Takzim.

The closing date for this quotation is at 12.00 noon, 05 May 2014 (Monday).

DIRECTOR OF
JOHOR STATE FORESTRY DEPARTMENT.
10 April 2014

 

 

 

Attachment 2

JOHOR STATE FORESTRY DEPARTMENT
DETAILS OF TENDER

1. WORK AREA

Details of work area are as below:

Tender No. Compt. & Forest Reserve Distance (KM)
PPNJ. 21/2014 (IP)PP/8/   TENDER Part of Compartment 3,4,5 Dan   5F Panti 10
Part of Compartment PA 36764,36762, 72214,72211, 72212 dan 46373 Seluyut 15
PPNJ. 22/2014 (IP)PP/9/   TENDER Part of Compartment 26,35,36,27 dan 28 Panti 19
PPNJ. 23/2014 (IP)PP/10/ TENDER Part of Compartment 110,111,128,126 dan 119 Lenggor 19

Plan of the work area will be provided to successful contractors only.

 

2. WORK SCOPE

Work scope that will be carried out in this tender are as below:-

  1. Demarcation of boundary compartment work at Permanent Forest Reserve
  2. Cleaning boundary compartment work at Permanent Forest Reserve (please refer Attachment I – Work Detail)
  3. Demarcate the benchmark with red paint on the surface and record the Global Positioning System (GPS) point for each benchmark found on a form that are prepared.

3. SIGN BOARD

Contractor are required to prepare one (1) unit of sign board indicating project area and placed it as instructed by the Control Officer or his representative. The sign board specification are as below:

  1. Material type : Fibreglass / Aluminium
  2. Thickness : ≥ 2mm
  3. Measurement : 2.0m x 1.0m
  4. Pole : Iron 5cm diameter with a clip to tie the sign board
  5. Letter Colour : Black
  6. Background : Yellow
 
Disclaimer  |  Security Policy  |  Privacy Policy  |  Sitemap  |  FAQ  |  User Helps  |  Poll
 Copyright Reserved (c) 2016 Johor State Forestry Department (JSFD)
Level 2, Bangunan Dato' Mohamad Ibrahim Munsyi, 79660 Nusajaya, Johor Darul Takzim.
Tel: 07-266 7433   Fax: 07-266 1288   Email: webjpnjohor[at]forestry[dot]gov[dot]my
Best viewed using popular browsers with 1280 x 800 pixels in resolutions.
 Last Update:
20/09/2019
   Visitor Counter:

127635